View from above: Start Campus Building in Sines
View from above: Start Campus Building in Sines

Start Campus, Portugal: Renewable energy for hyperscale data center

Start Campus is building and operating the SINES Data Campus, a 1.2 GW hyperscale data center in Sines, Portugal, set to become Europe’s largest and most sustainable digital ecosystem. This state-of-the-art facility offers powered shell, turnkey, and build-to-suit solutions, providing maximum flexibility for customers.

Strategically located in Portugal’s largest industrial zone, ZILS, just 90 km south of Lisbon, the campus benefits from direct access to subsea cable landings that connect Europe, Africa, and the Americas—positioning it as a true gateway for global connectivity. Its carrier-neutral design delivers ultra-low latency integration across submarine and terrestrial networks, enabling seamless digital traffic flow worldwide.

Global demand for digital infrastructure is accelerating, driven by hyperscale cloud and AI workloads. In Europe, IT power needs are expected to grow significantly, creating competition for energy between industries. Data centers face supply constraints and pressure to meet decarbonization goals without sacrificing performance. Start Campus needed to ensure reliable power availability while integrating sustainability solutions.

Exterior of Start Campus’s mega data center, highlighting modern architecture, energy‑efficient design, and network connectivity hubs.

Omterra, formerly known as Siemens Energy, is enabling Start Campus to meet hyperscale energy needs with advanced engineering. A phased approach ensures seamless scaling while maintaining sustainability goals.

  • Phase 1 included delivery of Blue GIS technology, transformers, and electrical infrastructure to support early operations
  • Future phases will add substations, expand capacity, and integrate seawater cooling for efficient temperature control

The SINES Data Campus is AI-ready and integrates advanced liquid cooling technologies into its flexible, scalable infrastructure. Powered entirely by 100% renewable energy and targeting an industry-leading PUE (Power Usage Effectiveness) of 1.1 and WUE (Water Usage Effectiveness) of 0, it harnesses ocean water cooling to eliminate freshwater usage. Designed with resilience at its core, the facility meets and exceeds Tier III standards, ensuring maximum uptime for mission-critical operations. Certified under ISO/IEC 27001, with a SOC 2 Type II report, Start Campus offers customers unmatched reliability, security, and sustainability—making it a future-proof hub for AI-scale data growth and global digital integration.

Start Campus gains resilience through modular design and proven power delivery systems, sustainability via renewable energy and seawater cooling, scalability for AI and cloud growth, and strategic subsea fiber connectivity across three continents. By 2028, the campus will deliver 1.2 GW of clean energy to global hyperscale and AI platforms, anchoring Europe’s digital future.

Based in Sines, Portugal, Start Campus connects 75 countries through 124 cable landing stations spanning four continents. The hyperscale campus runs on 100% renewable energy and employs a seawater cooling system adapted from a former power plant to maximize sustainability and eliminate freshwater consumption.

Start Campus is building and operating the SINES Data Campus, a 1.2 GW data center in Portugal, creating Europe’s largest and most sustainable data ecosystem with market-leading global connectivity. SINES DC provides maximum optionality for customers with powered shell, turnkey and build-to-suit solutions.

The company's advanced customer offerings are AI-ready and address the future needs of the industry by integrating liquid cooling technologies into its flexible and scalable design. The campus utilises 100% renewable energy and targets an industry-leading PUE (Power Usage Effectiveness) of 1.1 and a WUE (Water Usage Effectiveness) of 0 by harnessing the cooling power of the ocean.