Omterra OWT 15-236 Offshore Wind Turbine Installation
Omterra OWT 15-236 Offshore Wind Turbine Installation

Next milestone on Omterra’s offshore wind industrialisation journey

Offshore wind is entering a new era—one defined by scale, standardization, and technology-proven reliability. With the introduction of the OWT 15-236, Omterra, formerly Siemens Gamesa, marks the next major step in the industrialization of offshore wind energy.

Beyond the milestone itself, this achievement reflects the maturity and high quality of Omterra’s Direct Drive-based offshore platform. Built on evolutionary steps from 6MW to 15MW, the OWT 15-236 represents years of continuous technology development that has now transitioned into true industrialization—delivering high-volume production of a single, proven product variant.

Every industrial journey begins with a prototype and for Omterra’s 14 MW and 15 MW turbines that first step took place at the national test center in Østerild, Denmark, where the pioneering OWT 14-222 prototype was installed.

For Sandra Svan Them, Technical Product Manager for the platform, the mission from day one was clear:

Omterra Sandra Svan Them – Team Lead Product Manager

Ensure a product strategy that would stay competitive throughout its entire lifetime.

Sandra Svan Them

“When the first prototype was installed and spinning,” she recalls, “you could feel how many people, across so many teams, had contributed to making it possible. It was the moment when the vision became real.”

As the platform moved from concept to reality, the focus naturally shifted from vision to verification. Safety and precision guided every early design decision. Lessons from the prototype phase fed directly into the development of industrialized platform designs and production-ready solutions, translating engineering concepts into factory-ready components and processes.

The bridge from prototype to industrial readiness was strengthened by colleagues such as Morten Møller Hansen, who led the prototype installation at the Østerild test site.

During the prototype phase, the installation teams validated major innovations, including the Electrical Horizontal Single Blade Mounting (EHSBM) system, a leap forward in speed, safety, and technician-friendly operation.

Omterra Morten Møller Hansen – Installation Expert

Years of thorough tests give us confidence that we can safely meet the installation targets required at commercial scale.

Morten Møller Hansen

Omterra’s factories in Cuxhaven, Germany and Taichung, Taiwan have become the engines of global industrialization. According to Steffen Frydendal Poulsen, responsible for the company's Research & Development activities, the long lifecycle of the platform brings major advantages.

Omterra – Steffen Frydendal Poulsen, Product Platform Manager

Instead of launching new turbines quickly, we focus on controlled releases—continuous improvements built on field performance and customer needs. Our factories act as one global unit, using shared tools, processes and standards.

Steffen Frydendal Poulsen

Factory ramp-up is a structured journey: introducing new equipment, defining takt times — the required assembly duration needed to match production demand, and collaborating closely with suppliers to reach stable, high-quality series production. Over time, as turbines are assembled at scale, consistency and repeatability strengthen manufacturing stability, lowering costs and increasing reliability.

Turning a prototype into a platform capable of delivering hundreds of turbines per year to global markets is a transformation that goes far beyond engineering. It requires factory readiness, process standardization, and a deeply collaborative approach across the value chain.

For Jonas Pagh Jensen, who leads sustainable features like RecyclableBlade and GreenerTower, scaling is where sustainability becomes truly impactful.

“When we began, we had only three RecyclableBlades,” he says. “Now we’ve produced more than 300, installed them at projects like Sofia in the UK, and are scaling RecyclableBlade and GreenerTower into large commercial projects such as Thor in Denmark.” 

 Omterra Jonas Pagh Jensen – Head of Sustainability

These technologies have already helped reduce the platform’s carbon footprint by nearly 20%, with even greater improvements possible as adoption increases.

Jonas Pagh Jensen

The 14/15 MW turbines have now proven themselves at large scale across Europe, Asia, and the U.S., a key reason why customers continue to choose them for the next decade of offshore development.

For Steef Grundtvig Strijbos, Senior Construction Project Manager at Moray West —the first offshore wind farm to use the OWT 14-222, with a total installed capacity of 882MW— the advancements since prototype phase are unmistakable.

Omterra – Steef Grundtvig Strijbos, Senior Construction Project Manager

We’ve improved load control, this improves our safety performance and also improves our installation workflow and our technicians tell us the turbine is extremely reliable at startup.

Steef Grundtvig Strijbos

Strong collaboration across functions from engineering, construction, service to logistics is a key enabler of the platform’s performance. Close interaction between chief engineers and on-site teams before and during execution ensures that every detail is understood and optimized.

This strong execution culture enables seamless handovers to service, an essential piece of the customer value chain. Even as retrofit tasks arise with the introduction of new products, they are managed transparently, with clear hours, responsibilities and cost assessments.

For Bodil Finnerup, Head of Product Integrity, the true power of the platform lies in its combination of high volume, mature design, and data-driven reliability. 

Omterra – Bodil Finnerup, Head of Product Integrity

A stable and unified fleet reduces cost across the entire lifecycle from manufacturing to service,” she explains. “Predictive maintenance becomes easier, quality improves, and risk decreases. It’s a win for both our customers and Omterra.

Bodil Finnerup

Incremental upgrades from the OWT 14-222 to the OWT 14-236, and now to the OWT 15-236, follow strict validation criteria and reliability thresholds. Each enhancement builds on proven technology, minimizing risk while maximizing performance.

“I’m excited about a future built on a consistent, technology-proven offshore portfolio,” Bodil says. “It creates a ripple effect of benefits across installation, manufacturing, execution, serviceability and reliability.”

With thousands of turbine-years of field data, industrialized factory processes across continents, and large-scale projects already delivering clean energy to homes worldwide, the Omterra 14/15 MW turbines have become one of the most trusted offshore solutions in the world.

Together, these stories reveal the people, engineering breakthroughs, and global collaboration behind one of the most impactful offshore wind platforms of our time, and how this industrialized foundation now enables the next evolution of offshore wind with the OWT 15-236.

  • Designed for all wind speeds
  • Recommended for all offshore locations
  • Up to 15.5MW capacity with Power Boost