The combined-cycle power plant at BASF’s Schwarzheide chemical park, built in 1994, is undergoing a major sustainable transformation. Facing growing energy needs and a commitment to become climate neutral by 2050, BASF modernized the plant to boost efficiency, reduce emissions, and ensure a reliable energy supply for future growth in eco-friendly industries like battery material production.
Sustainability is an issue. Sustainability is a growth engine for us, a huge opportunity.
Today, the BASF site located in Schwarzheide, Germany, employs 3,500 people. The site is expected to grow and wants to enter new business fields, such as the production of battery material.
Creating chemistry for a sustainable future
The site will face an increased energy demand but is focused to become sustainable as it grows. If BASF is to achieve its goals to become climate neutral, a change in energy policy is vital. This is not just an end in itself, because BASF’s own customers, e.g. the automotive industry, signal a rapidly growing demand for eco-friendly products in their supply chain, too.
Flexible energy supply
The site's combined-cycle power plant (CCPP), built in 1994, supplies power, process steam and heat to the site. During modernization the uninterrupted power and heat supply of the site needed to be ensured.
In 2019, BASF Schwarzheide engaged Omterra to carry out a "brownfield exchange project". From 2020 to 2022, parts of the existing combined cycle power plant were modernized without interrupting ongoing operations. One of the two gas turbine lines were refurbished while the second gas turbine ensured the site's power supply. "An open heart surgery" as all project members described the task.
Omterra replaced one of the existing gas turbines with a OGT-800, thereby raising this line's output from 45 MW to 52 MW. Combined with a modernized generator, the power plant runs with increased efficiency while incurring lower fuel costs per kilowatt-hour.
A SIESTART battery energy storage system was installed during subsequent commissioning, enabling a black start of the power plant without having to rely on external power sources. Here too, BASF has decided to explore new avenues in a departure from the conventional solution with a diesel generator for the emergency power supply.
The project was finished in 2022 and the modernized power plant provides now a power output of 110 MW and 200m³/h steam.
Power plant upgrade: a brownfield exchange project
BEX Omterra “Plug and Play” concept for replacement of existing gas turbines with brand-new Omterra units ‒ a perfect match between old and new equipment to get a future proven design for at least 200 000 h.
Uninterrupted production
Existing interfaces are mandatory. All Omterra solutions and components must be adapted to customer’s space limitations while the site runs under full production. All modernization measures follow strict time schedule.
Energy storage: fossil-free black start capability
SISTART batteries for black start, independent from any grit. The battery system must have the power and capacity to provide three sequential black-starts of the newly installed OGT-800 gas turbine without recharging.
Increased power supply with a gas turbine SGT-800
A newbuilt SGT-800 gas turbine ensures the following performance:
Modifications and upgrades: the renewed generator (OEM)
Modernized generator, e.g. with revamped direction of rotation, optimizing the flow side inlet channels in the area of the rotor winding, adjusted dimensioning of individual components for higher currents and modified the base frame.
Condition based service with a long time service contract (LTP)
With a longtime service contract of 15 years for the gas turbine, we remain at the side of our customer BASF.
Omterra has been using digital tools for a long time to remotely analyze and maintain turbo sets. We recently added modern Argumented Reality technology to these tools and can use them to remotely guide your maintenance staff in isolating and correcting errors. In this way, even in times of limited travel opportunities, we bring our OEM know-how to your system and ensure its availability.
As the site is expected to grow and wants to enter new business fields, it will face an increased energy demand. At the same time BASF is focused to become sustainable while the site grows.
To achieve the goals to become climate neutral, increase efficiency and power output, the site's CCPP, built in 1994, needed to be modernized and upgraded.
The planning of the the brownfield exchange project started in 2019. From 2020 to 2022, parts of the existing combined cycle power plant were modernized without interrupting ongoing operations. In addition all modernization measures had to follow a strict time schedule.
This was a highly advanced and complex project as there were existing plant interfaces that needed to fit and be adapted to the Brownfield exchange product being supplied. The Re-use of the existing generator was a prime example of these challenges as it is now placed on the mirrored side of the GT requiring major modifications of the generator i.e. rotation direction. Detailed information of the generator beforehand was limited due to its age, so a large risk management effort was in place to secure handling of potential findings during the efforts in the workshop.
Iain Anderson, project manager service operations, reflects the project execution
Supplied is a B5 model of the SGT800, which is best suitable for the customer requirements in this project, especially for the green approach BASF is looking for, both now and their future cooperation. With the additional active orifice solution and lower TiT (turbine inlet temperature), we were able to reduce the original customer emission requirements even further, which makes this a highly sustainable product for future development within the carbon footprint visions.
Iain Anderson, project manager service operations, reflects the project execution
The cooperation with BASF on all project matters has been no less than excellent! We have mutually created a highly efficient and transparent communication throughout the project progress and duly included each other to always secure we manage risks and issues together and find the win-wins in all possible cases.
Iain Anderson, project manager service operations, reflects the project execution