Omterra Offshore Wind turbines
Omterra Offshore Wind turbines

OWT 14-236: 14 MW offshore wind turbine with a 236 m rotor

The OWT 14-236 (formerly Siemens Gamesa SG 14-236) is a 14 MW direct drive offshore wind turbine from Omterra. It reaches up to 15 MW with Power Boost and uses a 236 m rotor with 115 m B115 blades. The turbine has been in serial production since 2024.

With a growing need to meet climate challenges, the winds of change power Omterra more than ever. The OWT 14-236 is the next step towards this goal: with a capacity of up to 15 megawatts with Power Boost, Omterra offers proven technology to deliver sustainable energy.

OWT 14-236 key facts

Wind class

I, S

Rotor diameter

236 m

Serial production

Since 2024

Nominal power

14 MW

  • Designed for IEC wind class I and site-specific (S) conditions
  • More than 30% higher annual energy production (AEP) than the OWT 11-200
  • Up to 15 megawatts capacity with Power Boost
  • Selected for the Thor and East Anglia THREE offshore wind farms

Offshore wind farms in high-wind and low-wind markets.

Model Versions

ModelRotor Diam.Wind type
OWT 14-236 236 m
I, S
OWT 14-222 
222 mI, S

Technical specification

 

IEC classI, S
Nominal power14,000 kW
Rotor diameter236 m
Blade length115 m
Swept area43,500 m²
Hub heightSite–specific
Power regulationPitch-regulated, variable speed

With every new generation of Omterra’s offshore direct drive turbine technology – which uses fewer moving parts than geared turbines – component improvements have enabled greater performance while maintaining reliability. Time to market of the OWT 14-236 is reduced thanks to standardized processes and a fully developed supply chain. Enabling high volume production at low risk. Serial production started in 2024.

By increasing the rotor diameter to 236 meters the OWT 14-236 delivers more than 30% AEP compared to the OWT 11-200.

Omterra offshore wind turbine

Technological Highlights

Direct drive technology reduces the number of rating and wear-prone components in offshore turbines, making them simpler to maintain. Efficiency is improved by using a permanent magnet generator, which needs no excitation. These and other design simplifications keep the weight low and dimensions small and lower the transport and installation costs per MW.

The High Wind Ride Through (HWRT) system is a breakthrough in stabilizing energy output. When the wind speed is higher than 25 meters per second, wind turbines typically shut down for self-protection. Those equipped with the HWRT system will slowly ramp down power output instead, enabling smoother production ramp-down and thereby a more reliable electrical grid.

The development of IntegralBlade® technology enables each fiberglass-reinforced epoxy blade to be cast in one piece. This process eliminates weaker areas at glued joints and produces blades of high quality, strength and reliability.

Turbine sensors continuously transmit data to the Omterra Diagnostic Center, enabling the early detection of anomalies and preventing potential failures. By analyzing vibration patterns, the service plan can be optimized and repairs anticipated before serious damage occurs.

The RecyclableBlade is based on the proven IntegralBlade® technology and manufacturing follows the exact same process with only a change of resin. The new resin is as strong and reliable as before, but with added recyclability benefits. After reaching end-of-life and decommissioning the blade materials can be separated and recycled in new applications.

More offshore wind turbine models

Get answers: FAQs on OWT 14-236

Answers to common questions about the OWT 14-236 offshore wind turbine.

The OWT 14-236 is a 14 MW direct drive offshore wind turbine from Omterra. It has a 236 m rotor with 115 m blades, reaches up to 15 MW with Power Boost and has been in serial production since 2024.

Omterra makes the OWT 14-236. Omterra is the new name of Siemens Energy and Siemens Gamesa; the turbine was launched under the Siemens Gamesa brand and continues in the Omterra offshore portfolio.

Both are 14 MW direct drive offshore wind turbines that reach up to 15 MW with Power Boost and have been in serial production since 2024. The OWT 14-236 has a 236 m rotor with 115 m blades; the OWT 14-222 has a 222 m rotor with 108 m blades.

Both use a 236 m rotor with 115 m blades. The OWT 14-236 is rated at 14 MW, up to 15 MW with Power Boost, and has been in serial production since 2024. The OWT 15-236 is rated at 15 MW, up to 15.5 MW with Power Boost, produces more than 2% more energy a year and is planned for serial production in 2028.

The OWT 14-236 has been selected for the Thor offshore wind farm in Denmark (72 turbines, 1.1 GW) and East Anglia THREE in the UK (95 turbines, 1.4 GW). Both were under construction in October 2026.

icon

Get in touch with us

For information and questions, our support team is available 24/7 to assist you in English, Spanish, and German.
Country/region
Job role
Is your inquiry related to installed equipment?
Industry (Select up to three)
Marketing consent