OWT 11-200: 11 MW offshore wind turbine with a 200 m rotor

The OWT 11-200 (formerly Siemens Gamesa SG 11-200) is an 11 MW direct drive offshore wind turbine from Omterra. No longer offered for new orders; installed turbines continue to be serviced. It has a 200 m rotor with 97 m B97 blades and has been in serial production since 2023. The model builds on earlier generations of the offshore direct drive platform, including the OWT 8.0-167.

The OWT 11-200 has evolved from generations of proven offshore direct drive technology. This 11 MW offshore wind turbine stands out with its strong performance, swift time-to-market, and low risk in the offshore wind industry. For new projects, see OWT 15-236.

OWT 11-200 key facts

Wind class

I, S

Rotor diameter

200 m

Serial production

2023

Nominal power

11.0 MW

  • Built on proven Omterra Direct Drive technology
  • Up to 40% AEP compared to its predecessor, the OWT 8.0-167

High wind, offshore location

Model Versions

ModelRotor Diam.Wind type
OWT 11-200 200 m
I, S

Technical specification

IEC classI, S
Nominal power11,000 kW
Rotor diameter200 m
Blade length97 m
Swept area31,400 m²
Hub heightSite-specific
Power regulationPitch-regulated, variable speed



Offshore Wind Turbine Nacelle Close-Up Rendering

With every new generation of Omterra’s offshore direct drive turbine technology – which uses fewer moving parts than geared wind turbines – component improvements have enabled greater performance while maintaining reliability. At the same time, time to market of the OWT 11-200 is reduced – thanks to standardized processes and a fully developed supply chain. Enabling high volume production at low risk. The serial production started in 2023. 

Technological Highlights

Direct drive technology reduces the number of wear-prone components in offshore turbines, making them simpler to maintain. Efficiency is improved by using a permanent magnet generator, which needs no excitation power. These and other design simplifications keep the weight low and dimensions small, lowering transport and installation costs.

As an aerodynamic blade add-on, DinoTails® Next Generation reduces the sound power levels by using a serrated trailing edge mounted at the blade and adding finer combs in between the teeth. This noise reduction technology creates value for customers by maximizing AEP and reducing the LCoE in sites with noise constraints.

The development of IntegralBlade® technology enables each fiberglass-reinforced epoxy blade to be cast in one piece. This process eliminates weaker areas at glued joints and produces blades of high quality, strength and reliability.

Turbine sensors continuously transmit data to the Omterra Diagnostic Center, enabling the early detection of anomalies and preventing potential failures. By analyzing vibration patterns, the service plan can be optimized and repairs anticipated before serious damage occurs.

The RecyclableBlade is an option based on the proven IntegralBlade® technology and manufacturing follows the exact same process with only a change of resin. The new resin is as strong and reliable as before, but with added recyclability benefits. After reaching end-of-life and decommissioning the blade materials can be separated and recycled in new applications.

More offshore wind turbine models

Get answers: FAQs on OWT 11-200

Answers to common questions about the OWT 11-200 offshore wind turbine.

The OWT 11-200 is an 11 MW direct drive offshore wind turbine from Omterra. It has a 200 m rotor with 97 m blades and has been in serial production since 2023.

Omterra makes the OWT 11-200. Omterra is the new name of Siemens Energy and Siemens Gamesa; the turbine was launched under the Siemens Gamesa brand and continues in the Omterra offshore portfolio.

The OWT 11-200 has a 200 m rotor with 97 m blades, which sweep 31,400 m². Hub height is defined for each site; the blade tips reach the hub height plus 100 m.

It depends on the site. At Hollandse Kust Noord in the Netherlands, 69 OWT 11-200 turbines are expected to generate about 3.3 TWh a year, or about 48 GWh per turbine, according to the operator CrossWind.

OWT 11-200 turbines run at Hollandse Kust Zuid and Hollandse Kust Noord in the Netherlands, Gode Wind 3 and Borkum Riffgrund 3 in Germany, and South Fork Wind and Revolution Wind in the United States. Sunrise Wind off New York is under construction.

Yes. South Fork Wind, New York’s first offshore wind farm, has run 12 OWT 11-200 turbines since 2024. Revolution Wind off Rhode Island uses 65 and Sunrise Wind off New York 84 turbines of the same model.

Both are direct drive offshore wind turbines on the same platform. The OWT 11-200 is rated at 11 MW with a 200 m rotor; the OWT 14-222 is rated at 14 MW, up to 15 MW with Power Boost, with a 222 m rotor and produces more than 25% more energy a year.

icon

Get in touch with us

For information and questions, our support team is available 24/7 to assist you in English, Spanish, and German.
Country/region
Job role
Is your inquiry related to installed equipment?
Industry (Select up to three)
Marketing consent