Utility steam turbine
Utility steam turbine

Modernization & upgrades for utility steam turbines

Many power plants were built years, or even decades ago, to meet the market conditions of their time.

As these conditions have changed, Omterra has developed a range of targeted upgrade solutions that extend plant life, improve performance, and help power generating assets meet today's operational and market demands. 

Extending the operation period of mature steam turbines may require extensive measures, such as comprehensive repairs or major component replacements. In such cases, implementing modernization solutions can enhance revenue generation through efficiency improvements and thermodynamic optimizations. A steam turbine modernization may offer a significant opportunity to address new requirements from changing energy markets, such as enhanced unit flexibility, economic part load operation and transient full load operation.

Omterra focuses on the steam turbine and its auxiliary systems, providing interdisciplinary interfaces to address the boiler (or steam generator), the control system, and the balance of plant components in any modernization activity.

We assist in evaluating the net present value calculation and IRR (Internal Rate of Return) analyses necessary to justify the project.

In addition, our specialists provide turnkey installation of modernized equipment in concert with the plant's inspection requirements and scheduled outage duration, helping to plan the outage work in detail along with other subcontractors to ensure on-time completion.

Our references

With decades of fleet experience and a proven track record in implementing modernization projects, we have successfully modernized more than 350 steam turbines. In addition to our own steam turbine fleet (e.g. KWU, Westinghouse and Parsons), we have implemented modernizations on other-OEM steam turbine frames such as those manufactured by GE, MHI, Alstom and LMZ.

Vibration Monitoring

At Omterra, we can provide a full range of performance enhancement solutions for steam turbines. We have decades of experience in the field of modernization and maintenance of large steam turbines built with Omterra KWU, Westinghouse, and Parsons technology.

Nuclear steam turbine
  • Lifetime extension up to 40 years 
  • Turbine train efficiency improvement up to 3% 
  • Plant output improvement up to 10% 
  • Highest attainable availability and reliability 
  • Recover efficiency losses up to 2% due to degradation
Double Flow LP Steam Turbine
  • Lifetime extension up to 30 years 
  • Plant output improvement up to 12% with both GT and ST upgrade 
  • Improved flexibility such as capability for faster start-ups and increased start-up cycles 
  • Potential ST train efficiency improvement up to 2% points 
  • Flexible intervals for improved availability 
  • Potential carbon footprint reduction up to 32,000 tons CO2 per year through GT and ST upgrade* 
  • Service interval alignment GT/ST/Generator

* Calculation based on certain assumptions and conditions which may not be applicable.

Simple cycle steam power plant
  • Lifetime extension up to 30 years 
  • Potential carbon footprint reduction up to 1.5M tons CO2 per year in combination with boiler and steam turbine upgrade* 
  • Improved flexibility such as capability for low load operation 
  • Power output improvement up to 10% 
  • Efficiency improvement up to 4% points (up to 5% points with balance of plant optimization) 
  • Additional efficiency boosting by steam admission and reheat temperatures up to 610°C

* Calculation based on certain assumptions and conditions which may not be applicable.

Siemens Energy and Siemens Gamesa are now Omterra.

As the new brand is implemented progressively across our global operations, some existing company and product names, email addresses, and other identifiers may continue to appear during the transition.

Sendai power plant
  • Upgrade was implemented in 58 days as scheduled
  • Energy production increased by 230,000MWh compared to the year before the upgrade implementation
  • Higher reliability and availability
  • Efficiency increase
  • Higher SCC resistance with the help of the Omterra shrink-fit disc design

 

Combined cycle power plant
  • Lifetime extension of 30 years 
  • Minimized downtime by successful implementation of upgrade in 60 working days 
  • Performance increase by 5.7 MW
  • Efficiency increases by 1.13% points 
  • Improved reliability
Simple cycle steam plant
  • Power output increased by 10% to more than 545MW
  • HP turbine internal efficiency increased from 89% to 92.8% 
  • Greenhouse gas emissions reduction by about 85,000 tons of CO2 per year
  • Upgrade (exchange) was accomplished within 32 days 

 

Men is reading energy technologies news.

Newsletter

Sign up for the Omterra newsletter

Get the latest updates on technologies, expert insights, real-world projects shaping energy for society, plus invitations to upcoming events.
icon

Get in touch with us

For information and questions, our support team is available 24/7 to assist you in English, Spanish, and German.
Country/region
Job role
Is your inquiry related to installed equipment?
Industry (Select up to three)
Marketing consent