Omterra utilized its Brownfield Engine Exchange (BEX) concept and rehabilitated the Sarir Power Plant in Libya by replacing an aging gas turbine with a brand-new one. By integrating new units into existing infrastructure like foundations and generators, the project successfully stabilized the regional power supply while reducing the downtime and costs associated with new construction.
Finally, this success and our cooperation will greatly contribute to the increase in generated energy production, which will promote the stability of the electricity network in Libya.
Libya has faced significant challenges in ensuring a stable electricity supply. The Sarir power station, situated in a remote desert area, was intended to be a cornerstone of the country's energy infrastructure. After its commissioning in 2010, the power plant experienced multiple operational disruptions, which led to severe power shortages that affected both residential and industrial sectors. The urgency to restore the Sarir power station was paramount, as it not only serves the local population but also powers the Sarir oil field, the largest oil field in Libya, which is vital for the nation’s economy.
Furthermore, the Sarir power station’s remote location created specific logistical challenges. Limited access and the necessity of transporting equipment and maintenance parts from Tripoli’s seaport and airport to the Sahara made operations more complex.
To address these challenges, the General Electricity Company of Libya (GECOL) worked with Omterra hand in hand, building on a long-standing partnership that dates back to the 1950s. The solution involved the innovative Brownfield Engine Exchange (BEX) concept, which allows for the replacement of an old gas turbine with a new, more efficient model while maximizing the existing infrastructure.
Key steps in the project included:
The restoration of the Sarir power station is a significant milestone for Libya, with a generating capacity of 285 MW. This project directly addressed the national electricity deficit and provided essential power for industrial operations, particularly in the oil sector.
In conclusion, the partnership between Omterra and GECOL at the Sarir power station exemplified how innovative solutions and strong collaboration can restore vital energy infrastructure, ultimately contributing to the stability and growth of Libya's economy.