Employees talking in control room
Employees talking in control room

Turn start-up speed into revenue with Flex-Power Services™

Transform your combined cycle plant into a responsive asset that can start 50% faster, save 400 MWhth per warm start, and capture peak revenue. Stay hot-ready for up to 2 weeks during low demand while slashing startup costs to four digits.

Problem: Inefficient transient states during frequent cycling consume fuel and can affect your capacity to provide efficient peak power.

Solution: Implement Omterra On the Fly start-up and fast shutdown solutions to minimize time spent in low-efficiency zones.

Problem: High minimum loads can force costly shutdowns, leading to expensive restarts and missed dispatch opportunities.

Solution: With the Demand Response and Go-Ready upgrades, you can either remain synchronized at low loads with faster ramp capability or shut down strategically while ensuring reliability, and staying ready for fast restart when needed.

Problem: Slow start-up times and conservative ramp rates can prevent your plant from responding fast enough to capture high‑margin price spikes and meet market start-time requirements.

Solution: Start-performance and Start-readiness upgrades, enable faster synchronization and dispatch, ensuring you capture price spikes and meet strict market entry thresholds.

Save fuel during every start and shutdown

Worker in power plant

By choosing Hot/Warm Start on the Fly and Fast Plant Shutdown, you can optimize the most fuel-intensive phases of your plant’s operation. These solutions allow you to bypass unprofitable transient periods and reach optimal efficiency faster.

  • Reduce Fuel Consumption: Substantially lower fuel consumption by up to 400 MWhth per warm start.
  • Accelerate Plant Shutdown: Potentially cut shutdown times to below 15 minutes, alleviating fuel waste during unloading and shutdown operation.
  • Save More: Save 4-digits in start-up costs per hot start by reaching load sooner.
  • Reduce Start-up Emissions: Lower emissions by minimizing time spent in non-optimal combustion states.

Stay ready when demand returns

Workers walking in power plant

The Demand Response and Go-Ready solutions give you two proven flexibility paths: operate reliably at reduced load with fast ramp-up, or maintain hot or warm start readiness during standstill. By lowering your Minimum Stable Generation and preserving thermal conditions, you can minimize stress, avoid penalties, and stay dispatch-ready when the grid calls. 

  • Extended "Hot" Status: Maintain warm-start readiness for up to two weeks of standstill with automated preservation.
  • Reduced Minimum Load: Stay synchronized during low-demand hours to support primary and secondary frequency response.
  • Faster Maintenance Access: Reduced cool-down times allow for quicker inspections and shorter planned outages.

Capture high margin peak hours

Omterra experts in power plant

To capitalize on high-margin hours, your plant needs to act as a "first responder." Start-performance and Start-readiness upgrades help you synchronize faster, stay reliable and reach dispatchable load sooner so you can capture price spikes and meet strict start-time thresholds for market participation.

  • Faster Starts: Cut start-up time by up to 50% (in applicable cases) to meet strict market participation requirements.
  • More Dispatch Opportunities: Reduce combined-cycle warm start-up time to below 45 minutes in some cases, helping you be online sooner and more often when opportunities appear. 
  • Aggressive Load Gradients: Increase your MW/min ramp rates to ensure you are the first to capture revenue during price spikes.

Discover the performance benefits achieved through Omterra operational flexibility upgrades, which empower power plant operators to transform their profiles based on plant specific configuration and operating conditions:

  • Advanced start-up optimization enabled a German combined cycle plant to transition from baseload to cycling with a hot‑start time of approximately 27 minutes.
  • This allowed rapid entry into the market during high‑value dispatch periods.
  • It also improved competitiveness and supported reliable operation in a renewables‑driven system.
  • A series of Flex‑Power Services™ upgrades significantly boosted a German combined cycle power plant’s cycling performance.
  • It reduced the hot‑start times by up to 20 minutes and cut down warm‑start and shutdown durations by roughly 50%.
  • Additional ramping enhancements improved the plant’s ability to respond to short‑notice dispatch signals, reducing time spent in inefficient operating modes.
  • A combined cycle plant in South America utilized Flex-Power Services™ to significantly improve start readiness after extended shutdowns.
  • Its start‑up time was reduced from approximately 12 hours to about 5 hours. 
  • This enhanced the plant’s operational flexibility, enabling participation in competitive capacity and energy auctions.

Results depend on plant configuration, operating conditions, and site‑specific factors; actual performance may vary.

icon

Get in touch with us

For information and questions, our support team is available 24/7 to assist you in English, Spanish, and German.
Country/region
Job role
Is your inquiry related to installed equipment?
Industry (Select up to three)
Marketing consent
female gas turbine specialist working in factory

Looking for more than just start-up and load optimization? The complete Omterra Flex-Power Services™ portfolio offers a comprehensive suite of digital, mechanical, and control solutions designed to future-proof every aspect of your generating assets.